New Rail Bridges Kiwi Rail Tauranga
PROJECT: Waterproofing/coating of 2 Steel Rail Bridges ECMT
Bridges 48, 52, 63 Tauranga and one Concrete Bridge
Client: Kiwi Rail
Substrate: Weathering Steel
Type of Structure: Bolted sectional rail bridge/concrete
Project Specification: Polymer Group Ltd/Stirling Lloyd Eliminator
Application Manager: Polymer Group Ltd, Contracting Division
Main Contractor: Downer New Zealand Ltd
System Used: Zed S94 Metal Primer, Eliminator